Contract Crushing
KKB specialises in recovering and recycling inert construction and civil engineering wastes.
The very latest techniques and technologies
We are able to apply the very latest techniques and technologies to maximise the value of waste material generated during enabling works to increase the overall efficiency and sustainability of regeneration and infrastructure developments.
We have a local authority permit (issued by Medway Council) to perform on-site crushing of concrete and hardcore wastes to produce graded material (Type 1/6F2/HBM) for re-use as infill, piling mats and sub-base in the development. We can implement WRAP Quality Protocols to prepare certificated recycled aggregates if required.
Specialist equipment and labour can be provided to collate, segregate and process other wastes generated during regeneration projects. Our fleet is made up of multiple crushers (jaw, cone and impact), multiple screening plants (multi-deck and scalping), excavators (20 – 70 tonnes) and loading shovels with plant movements undertaken using our own low loaders. Most of our machines are diesel-electric and extremely fuel-efficient.
Full chain of custody documentation and detailed environmental data including destinations and recycling stats can be provided to help demonstrate environmental best practice.
Material we recycle
Latest Contract Crushing Projects
Testimonials
KKB accomplished this development with no little skill and professionalism. Their innovative ideas for re-using waste material delivered substantial cost savings as well as contributing to the sustainability of the project
Excellent disaster response within the hour from KKB Group who mobilised people, plant and equipment in a professional and safe manner. Nothing but praise for all KKB staff from the start to the finish of the job allowing the M20 to reopen within 24 hours
We are very impressed with the professional approach of KKB to the management of all aspects of the earthworks and remediation for this project and look forward to working with the team again
KKB’s experience of crushing, screening and site logistics has enabled us to efficiently extract and process minerals into high-quality secondary aggregates. Their ability to recycle inert wastes into specific sizes enables our plant to generate highways-grade CBM and enhance projects’ overall sustainability
KKB’s commitment and professionalism has been exceptional. The reaction from handover has been amazing. You should all be very proud of yourselves and each other, an amazing achievement and rightly recognised by Highways England. I would also like to thank your families for supporting you all whilst working silly hours at short notice on a bank holiday weekend. The M20 is probably one of the most important routes in this country, hence at times like this you are some of the most important people in the country. Well done all.
We were very impressed with KKB’s performance and can-do attitude in delivering a series of complex packages of enabling works for our new Tilbury facility. Their management team adopted a consultative approach throughout to transform our concepts into reality. The two-year project was completed on-programme, to-specification and without any major issues. The standard of workmanship was also to a very high quality
This site was deemed to be difficult and challenging to remediate. The entire team at KKB were brilliant and always had the expertise and resources to resolve any problems. I am delighted at the end results. In my opinion, the job couldn’t have gone any better
Hanson Aggregates have been using KKB Plant for 20 years and we have always found their attention to detail, safe systems of working and professionalism ahead of the competition
Tarmac and KKB have a true partnership, KKB provide Asphalt processing and recycle construction and demolition waste for Tarmac at 25 sites across the South. This provides flexibility for Tarmac and a consistent work load for KKB. Through collaboration KKB minimises transport costs whilst Tarmac ensure a quality product is available at all sites on demand. KKB provide advice and support and deliver innovative low cost solutions on request. I am extremely happy with how the relationship has developed it is working well for both parties.
KKB’s knowledge of remediation and partnering approach made them a valuable member of project team. They were able to apply significant resources in terms of manpower and equipment which allowed us to deliver the enabling phase on-budget and ahead of programme
The Kingsnorth project was challenging with several revisions to scope due to changes in ground conditions, the potential for UXO, abnormally inclement weather and ultimately the onset of the Covid 19 pandemic. Throughout KKB remained professional in their response to these changes, worked flexibly with us and other contractors and completed the work within the agreed timescales and to the expected quality. We would be happy to engage KKB for similar work in the future
KKB performed safely, reliably and collaboratively during this project. Their management team were well organised, pragmatic, and diligent to work with and both we and our representatives on site are very satisfied with the services they have provided us
We were impressed with the professionalism and attention to detail that KKB were able to bring to this project. Their experience and ability to liaise with our project team as well as outside agencies helped to streamline a complex and challenging enabling phase.
KKB successfully delivered these works earlier than programmed, through being proactive and continuously driving the project forwards. Their staff communicated well and ensured that the project team were aware of progress and any issues which arose were swiftly dealt with in a very practical way
We were really impressed with all aspects of KKB’s performance on this load and haul project. Excellent communications with their Project Manager and Site Supervisor ensured the works were well organised while the experience and expertise of their site operatives helped deliver the project safely, on-time and to-specification
KKB Remediation carried out the works at Crawley Works for us. They were selected from a list of 4 tendering contractors as being the best bid and best price. They completed works in 23 weeks. Their price was around £2.7m including novated fees of our engineer. The works involved the introduction of the highways to the site and lengths of private road with relevant infrastructure. They were complete to time and cost parameters and to a good standard. Based on our experience of working with KKB Remediation we would have no problem recommending them for similar work opportunities
KKB have a continual positive attitude and collaborative project team that are a credit to the company