Case Studies > Civil Engineering

Chatham Waters Phase 2

Phase 2 works involved the dewatering of various excavations and treatment of the perched water followed by the remediation of the identified hot-spots, including the treatment, separation…

Read more

Chatham Waters Phase 1

KKB Group, following a successful competitive tendering process, were engaged by Sisk as their Tier 1 Contractor to deliver the Phase 1 Earthworks package at the prestigious…

Read more

Tarmac Depot (off Cowley Road), Cambridge

KKB Remediation were engaged to conduct alterations to the Tarmac Depot off Cowley Road in Cambridge. The works were conducted in 3 phases. Phase 1 involved the…

Read more

Trackwork Moll – Doncaster

In May 2013 KKB Remediation Limited were commissioned by Trackwork Moll, a manufacturer of high quality pre-stressed concrete railway sleepers, to construct a railway siding at its…

Read more

Ministry of Defence – Suffolk

In late 2012 KKB Remediation Limited won a competitive tender to carry out the decommissioning of three Semi Buried Bulk Fuel Installation tanks and the removal of…

Read more

Greenspan – Sittingbourne

Borden lane was formerly an area of scrub land to the rear of residential houses in Borden Lane, Sittingbourne, Kent. The contract initially included minor demolition works…

Read more

Gill Aggregates – Northfleet

KKB Remediation Limited were commissioned to set-up an aggregate bagging and distribution centre. The 1.2 hectare site had previously been used as a storage area for silt…

Read more

Exton Estates – Crawley

Following a competitive tendering process KKB Remediation Limited were appointed to build a one kilometre spine road to service the 30-acre Principal Park development on the former…

Read more

Envigula – Medway

The Clarendon Drive site in Medway was purchased by KKB Group in early 2011 with a view to re-developing it into a residential properties. The site was…

Read more

Cliffe Contractors – Whitstable

The works comprised bulk cut and fill earthworks with Lime Cement Soil Stabilisation to prepare the site for future development. The Project was to prepare the ground…

Read more