Case Studies >

Hanson – Dagenham Depot New Plant Bases

The contract is being delivered under the ICC Minor Works form of contract and works commenced on site in April 2018. Following Geo-environmental and UXO surveys conducted…

Read more

S Walsh – Edgeware Road – Remediation of Asbestos Impacted Soils

The works involved the processing, picking and screening of 10,000m3 of Asbestos impacted material which was carried out under the KKB Groups Environmental Agency Mobile Treatment Licence.…

Read more

Gill Aggregates – Paved Storage Area – Dagenham

The works were located immediately adjacent to a ‘live’ operational (24 hrs) concrete batching plant with the 278-works joining the site to an access road shared by…

Read more

Houlihans – Former Paper Mill – Sittingbourne

The works were on a 2.5 Hectare site of a former paper mill in Sittingbourne, Kent. KKB Group were engaged to take up the floor slab, remove…

Read more

Chatham Waters Phase 2

Phase 2 works involved the dewatering of various excavations and treatment of the perched water followed by the remediation of the identified hot-spots, including the treatment, separation…

Read more

Wivenhoe Aggregate Processing Plant Demolition

The works involved the dismantling and demolition of the redundant Aggregate Processing Plant at the Tarmac Depot in Wivenhoe, Essex. The steel structures were taken down using…

Read more

Santon Aggregate Processing Plant Demolition

The steel structures were taken down using45 ton ‘Long Reach’ and 30 Ton demolition specified excavators utilizing shear attachments, breaker attachments and pulverisor attachments. The Plant was…

Read more

Chatham Waters Phase 1

KKB Group, following a successful competitive tendering process, were engaged by Sisk as their Tier 1 Contractor to deliver the Phase 1 Earthworks package at the prestigious…

Read more

Disaster Recovery, M20 Footbridge Collapse, Snodland, Kent

KKB Group mobilised to site within 40 minutes of receiving an emergency call out to a footbridge collapse across the M20 Motorway in Kent. KKB Group worked…

Read more

Tarmac Depot (off Cowley Road), Cambridge

KKB Remediation were engaged to conduct alterations to the Tarmac Depot off Cowley Road in Cambridge. The works were conducted in 3 phases. Phase 1 involved the…

Read more